Skip to content

Isolate testSelectInformationSchemaTables for SQL Server #61824

Isolate testSelectInformationSchemaTables for SQL Server

Isolate testSelectInformationSchemaTables for SQL Server #61824

Triggered via pull request March 14, 2024 23:14
Status Failure
Total duration 1h 2m 0s
Artifacts 8

ci.yml

on: pull_request
check-commits-dispatcher
36s
check-commits-dispatcher
build-test-matrix
57s
build-test-matrix
artifact-checks
17m 36s
artifact-checks
error-prone-checks
2m 47s
error-prone-checks
web-ui-checks
1m 4s
web-ui-checks
test-jdbc-compatibility
2m 37s
test-jdbc-compatibility
test-other-modules
6m 33s
test-other-modules
Matrix: hive-tests
Matrix: maven-checks
Matrix: check-commit
Matrix: pt
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

2 errors and 1 warning
test (testing/trino-faulttolerant-tests, test-fault-tolerant-hive)
The job running on runner GitHub Actions 30 has exceeded the maximum execution time of 60 minutes.
test (testing/trino-faulttolerant-tests, test-fault-tolerant-hive)
The operation was canceled.
test (testing/trino-faulttolerant-tests, test-fault-tolerant-hive)
You are running out of disk space. The runner will stop working when the machine runs out of disk space. Free space left: 55 MB

Artifacts

Produced during runtime
Name Size
product tests and server tarball Expired
1.24 GB
test report plugin_trino-sqlserver, , Expired
221 KB
test report pt (default, suite-7-non-generic, ) Expired
16.8 KB
test report pt (default, suite-all-connectors-smoke, ) Expired
883 Bytes
test report testing_trino-faulttolerant-tests, default, Expired
56.8 KB
test report testing_trino-faulttolerant-tests, test-fault-tolerant-delta, Expired
19.3 KB
test report testing_trino-faulttolerant-tests, test-fault-tolerant-hive, Expired
173 KB
test report testing_trino-faulttolerant-tests, test-fault-tolerant-iceberg, Expired
48.5 KB