Skip to content

Build

Build #65

Triggered via schedule January 13, 2024 10:05
Status Failure
Total duration 5m 59s
Artifacts

build.yml

on: schedule
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

7 errors
build (master, get)
Process completed with exit code 1.
build (master, upgrade)
The job was canceled because "master_get" failed.
build (master, upgrade)
The operation was canceled.
build (stable, upgrade)
The job was canceled because "master_get" failed.
build (stable, upgrade)
The operation was canceled.
build (stable, get)
The job was canceled because "master_get" failed.
build (stable, get)
The operation was canceled.