Bump actions/checkout from 4.1.0 to 4.1.1 #695
acceptance-testing-e2e.yml
on: pull_request
build
4m 44s
Matrix: test-full-e2e
Matrix: test-sensor-e2e
Annotations
12 errors
test-sensor-e2e (ubuntu-latest):
pkg/appbom/gobinhash.go#L10
pattern gobinhash: no matching files found
|
test-sensor-e2e (ubuntu-latest)
Process completed with exit code 2.
|
test-full-e2e (ubuntu-latest, haskell)
Process completed with exit code 2.
|
test-full-e2e (ubuntu-latest, golang)
The job was canceled because "ubuntu-latest_haskell" failed.
|
test-full-e2e (ubuntu-latest, node)
The job was canceled because "ubuntu-latest_haskell" failed.
|
test-full-e2e (ubuntu-latest, node)
The operation was canceled.
|
test-full-e2e (ubuntu-latest, http-probe)
The job was canceled because "ubuntu-latest_haskell" failed.
|
test-full-e2e (ubuntu-latest, http-probe)
The operation was canceled.
|
test-full-e2e (ubuntu-latest, python)
The job was canceled because "ubuntu-latest_haskell" failed.
|
test-full-e2e (ubuntu-latest, python)
The operation was canceled.
|
test-full-e2e (ubuntu-latest, ruby)
The job was canceled because "ubuntu-latest_haskell" failed.
|
test-full-e2e (ubuntu-latest, ruby)
The operation was canceled.
|
Artifacts
Produced during runtime
Name | Size | |
---|---|---|
dist_linux
Expired
|
98.9 MB |
|
dist_linux_arm
Expired
|
95.4 MB |
|
dist_linux_arm64
Expired
|
95.7 MB |
|
dist_mac
Expired
|
110 MB |
|