Skip to content

upkeep.dhall: replace maximize-build-space action with a custom script #1877

upkeep.dhall: replace maximize-build-space action with a custom script

upkeep.dhall: replace maximize-build-space action with a custom script #1877

Triggered via push November 3, 2023 19:26
Status Failure
Total duration 6h 0m 31s
Artifacts

Annotations

14 errors
tensorflow-datasets
Process completed with exit code 1.
tensorflow-bin
The runner has received a shutdown signal. This can happen when the runner service is stopped, or a manually started runner is canceled.
tensorflow-bin
Process completed with exit code 143.
vscode
Process completed with exit code 1.
flax
The runner has received a shutdown signal. This can happen when the runner service is stopped, or a manually started runner is canceled.
flax
Process completed with exit code 143.
jax
The runner has received a shutdown signal. This can happen when the runner service is stopped, or a manually started runner is canceled.
jax
Process completed with exit code 143.
augmax
The runner has received a shutdown signal. This can happen when the runner service is stopped, or a manually started runner is canceled.
augmax
Process completed with exit code 143.
optax
The runner has received a shutdown signal. This can happen when the runner service is stopped, or a manually started runner is canceled.
optax
Process completed with exit code 143.
tensorflow
The job running on runner GitHub Actions 17 has exceeded the maximum execution time of 360 minutes.
tensorflow
The operation was canceled.