Skip to content

chore: bump github.com/aws/aws-sdk-go-v2/service/s3 from 1.71.1 to 1.72.2 #215

chore: bump github.com/aws/aws-sdk-go-v2/service/s3 from 1.71.1 to 1.72.2

chore: bump github.com/aws/aws-sdk-go-v2/service/s3 from 1.71.1 to 1.72.2 #215

Status Failure
Total duration 1m 26s
Artifacts

pr_test-matrix.yml

on: pull_request
Matrix: linux-matrix
Matrix: windows-matrix
Fit to window
Zoom out
Zoom in

Annotations

6 errors and 1 warning
linux-matrix (1.23, ubuntu-latest)
Process completed with exit code 1.
linux-matrix (1.22, ubuntu-latest)
The job was canceled because "_1_23_ubuntu-latest" failed.
linux-matrix (1.22, ubuntu-latest)
The operation was canceled.
windows-matrix (1.23, windows-latest)
Process completed with exit code 1.
windows-matrix (1.22, windows-latest)
The job was canceled because "_1_23_windows-latest" failed.
windows-matrix (1.22, windows-latest)
The operation was canceled.
linux-matrix (1.23, ubuntu-latest)
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636