Skip to content

ensure existing tests target sub v3 client #129

ensure existing tests target sub v3 client

ensure existing tests target sub v3 client #129

Triggered via push October 31, 2024 20:10
Status Failure
Total duration 33s
Artifacts

main.yml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

9 errors
build (3.9)
Process completed with exit code 2.
build (3.8)
The job was canceled because "_3_9" failed.
build (3.8)
Process completed with exit code 2.
build (3.11)
The job was canceled because "_3_9" failed.
build (3.11)
Process completed with exit code 2.
build (3.10)
The job was canceled because "_3_9" failed.
build (3.10)
The operation was canceled.
build (3.7)
The job was canceled because "_3_9" failed.
build (3.7)
The operation was canceled.