Upgrade Rust toolchain to 2024-11-08 #807
Triggered via pull request
November 9, 2024 03:41
Status
Failure
Total duration
6h 0m 26s
Artifacts
–
Annotations
6 errors
verify-std (ubuntu-22.04)
The job running on runner GitHub Actions 526 has exceeded the maximum execution time of 360 minutes.
|
verify-std (ubuntu-22.04)
The operation was canceled.
|
verify-std (ubuntu-22.04)
Process completed with exit code 1.
|
verify-std (macos-14)
The job running on runner GitHub Actions 201 has exceeded the maximum execution time of 360 minutes.
|
verify-std (macos-14)
Process completed with exit code 1.
|
verify-std (macos-14)
The operation was canceled.
|