chore(deps): update dependency @preconstruct/cli to v2.8.9 #2800
Triggered via pull request
October 15, 2024 13:37
Status
Failure
Total duration
6h 0m 24s
Artifacts
–
tests_ci.yml
on: pull_request
Linting
1m 37s
Linting
4m 44s
Package Unit Tests
2m 16s
Field CRUD Tests PostgreSQL
1m 51s
Field CRUD Tests SQLite
1m 26s
Field CRUD Tests MySQL
1m 29s
Testing example project
4m 23s
Ensure Next in App directory builds
5m 0s
Matrix: Integration tests for Admin UI
Matrix: Smoke Tests For Examples
Matrix: API Tests MySQL
Matrix: API Tests PostgreSQL
Matrix: API Tests SQLite
Annotations
7 errors
Linting:
examples/extend-graphql-schema-nexus/schema.ts#L99
Right operand of ?? is unreachable because the left operand is never nullish.
|
Linting
Process completed with exit code 2.
|
Integration tests for Admin UI (live-reloading.test.ts)
Process completed with exit code 1.
|
Integration tests for Admin UI (list-view-crud.test.ts)
The job running on runner GitHub Actions 44 has exceeded the maximum execution time of 360 minutes.
|
Integration tests for Admin UI (list-view-crud.test.ts)
The operation was canceled.
|
Integration tests for Admin UI (relations.test.ts)
The job running on runner GitHub Actions 52 has exceeded the maximum execution time of 360 minutes.
|
Integration tests for Admin UI (relations.test.ts)
The operation was canceled.
|