Skip to content

feat: rough nn tutorials #164

feat: rough nn tutorials

feat: rough nn tutorials #164

Triggered via push October 28, 2024 19:41
Status Failure
Total duration 4m 40s
Artifacts

ci.yml

on: push
Matrix: Test
Fit to window
Zoom out
Zoom in

Annotations

9 errors
Test (ubuntu-latest, 3.9)
Process completed with exit code 1.
Test (ubuntu-latest, 3.12)
The job was canceled because "ubuntu-latest_3_9" failed.
Test (ubuntu-latest, 3.12)
The operation was canceled.
Test (ubuntu-latest, 3.8)
The job was canceled because "ubuntu-latest_3_9" failed.
Test (ubuntu-latest, 3.8)
The operation was canceled.
Test (ubuntu-latest, 3.11)
The job was canceled because "ubuntu-latest_3_9" failed.
Test (ubuntu-latest, 3.11)
The operation was canceled.
Test (ubuntu-latest, 3.10)
The job was canceled because "ubuntu-latest_3_9" failed.
Test (ubuntu-latest, 3.10)
The operation was canceled.