Skip to content

chore(helm): update pipeline db version #1303

chore(helm): update pipeline db version

chore(helm): update pipeline db version #1303

Triggered via push February 10, 2025 03:49
Status Failure
Total duration 2h 0m 25s
Artifacts
console  /  helm-integration-test-console
2h 0m
console / helm-integration-test-console
Matrix: backend
Fit to window
Zoom out
Zoom in

Annotations

11 errors and 1 warning
backend (pipeline-backend) / helm-integration-test
The job running on runner GitHub Actions 44 has exceeded the maximum execution time of 120 minutes.
backend (pipeline-backend) / helm-integration-test
The operation was canceled.
backend (model-backend) / helm-integration-test
The job running on runner GitHub Actions 22 has exceeded the maximum execution time of 120 minutes.
backend (model-backend) / helm-integration-test
The operation was canceled.
backend (artifact-backend) / helm-integration-test
The job running on runner GitHub Actions 23 has exceeded the maximum execution time of 120 minutes.
backend (artifact-backend) / helm-integration-test
The operation was canceled.
console / helm-integration-test-console
The job running on runner GitHub Actions 24 has exceeded the maximum execution time of 120 minutes.
console / helm-integration-test-console
The operation was canceled.
console / helm-integration-test-console
Process completed with exit code 1.
backend (mgmt-backend) / helm-integration-test
The job running on runner GitHub Actions 8 has exceeded the maximum execution time of 120 minutes.
backend (mgmt-backend) / helm-integration-test
The operation was canceled.
console / helm-integration-test-console
No files were found with the provided path: test-results. No artifacts will be uploaded.