Skip to content

build(deps): bump github.com/ProtonMail/go-crypto from 1.1.0 to 1.1.2… #659

build(deps): bump github.com/ProtonMail/go-crypto from 1.1.0 to 1.1.2…

build(deps): bump github.com/ProtonMail/go-crypto from 1.1.0 to 1.1.2… #659

Triggered via push November 8, 2024 16:24
Status Failure
Total duration 7m 9s
Artifacts

test.yml

on: push
resolve-versions
5s
resolve-versions
copywrite
0s
copywrite
Matrix: build
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

4 errors
resolve-versions
The job running on runner GitHub Actions 2877 has exceeded the maximum execution time of 5 minutes.
resolve-versions
The operation was canceled.
copywrite
The job running on runner GitHub Actions 131 has exceeded the maximum execution time of 3 minutes.
copywrite
A task was canceled.