Fixing unfeasible scheduling keys bug (#182) (#3845) #263
ci.yml
on: push
lint
/
Lint TypeScript
12s
lint
/
Lint Go
19s
test
/
TypeScript Unit Tests
12s
test
/
Proto Up To Date
0s
build
/
prepare
0s
build
/
pack-nuget
0s
test
/
Golang Mod Up To Date
12s
test
/
Golang Unit Tests
0s
test
/
Golang Integration Tests
0s
All required checks done
0s
Annotations
12 errors
build / pack-nuget
Canceling since a higher priority waiting request for 'CI-refs/heads/master' exists
|
test / Proto Up To Date
Canceling since a higher priority waiting request for 'CI-refs/heads/master' exists
|
lint / Lint TypeScript
Canceling since a higher priority waiting request for 'CI-refs/heads/master' exists
|
lint / Lint TypeScript
The operation was canceled.
|
test / TypeScript Unit Tests
Canceling since a higher priority waiting request for 'CI-refs/heads/master' exists
|
test / TypeScript Unit Tests
❌ No test results found for JUnit Test Report
|
test / TypeScript Unit Tests
No files were found with the provided path: ./internal/lookout/ui/junit.xml. No artifacts will be uploaded.
|
test / TypeScript Unit Tests
The operation was canceled.
|
test / Golang Mod Up To Date
Canceling since a higher priority waiting request for 'CI-refs/heads/master' exists
|
test / Golang Mod Up To Date
The operation was canceled.
|
lint / Lint Go
Canceling since a higher priority waiting request for 'CI-refs/heads/master' exists
|
lint / Lint Go
The operation was canceled.
|