Skip to content

build(deps): bump morphy2k/revive-action from 2.5.4 to 2.5.5 #119

build(deps): bump morphy2k/revive-action from 2.5.4 to 2.5.5

build(deps): bump morphy2k/revive-action from 2.5.4 to 2.5.5 #119

Triggered via pull request January 5, 2024 06:21
Status Failure
Total duration 48s
Artifacts
This run and associated checks have been archived and are scheduled for deletion. Learn more about checks retention

go.yml

on: pull_request
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

5 errors and 6 warnings
Test on go 1.19 and ubuntu-latest
Docker build failed with exit code 1
Test on go 1.20 and ubuntu-latest
The job was canceled because "ubuntu-latest_1_19" failed.
Test on go 1.20 and ubuntu-latest
The operation was canceled.
Test on go 1.18 and ubuntu-latest
The job was canceled because "ubuntu-latest_1_19" failed.
Test on go 1.18 and ubuntu-latest
The operation was canceled.
Test on go 1.19 and ubuntu-latest
Docker build failed with exit code 1, back off 1.447 seconds before retry.
Test on go 1.19 and ubuntu-latest
Docker build failed with exit code 1, back off 5.353 seconds before retry.
Test on go 1.20 and ubuntu-latest
Docker build failed with exit code 1, back off 6.826 seconds before retry.
Test on go 1.20 and ubuntu-latest
Docker build failed with exit code 1, back off 9.397 seconds before retry.
Test on go 1.18 and ubuntu-latest
Docker build failed with exit code 1, back off 7.741 seconds before retry.
Test on go 1.18 and ubuntu-latest
Docker build failed with exit code 1, back off 7.239 seconds before retry.