build(deps): bump morphy2k/revive-action from 2.5.4 to 2.5.5 (#182) #435
Annotations
5 errors and 6 warnings
Test on go 1.19
Docker build failed with exit code 1
|
Test on go 1.20
The job was canceled because "_1_19" failed.
|
Test on go 1.20
The operation was canceled.
|
Test on go 1.21
The job was canceled because "_1_19" failed.
|
Test on go 1.21
The operation was canceled.
|
Test on go 1.19
Docker build failed with exit code 1, back off 2.841 seconds before retry.
|
Test on go 1.19
Docker build failed with exit code 1, back off 4.729 seconds before retry.
|
Test on go 1.20
Docker build failed with exit code 1, back off 8.864 seconds before retry.
|
Test on go 1.20
Docker build failed with exit code 1, back off 4.686 seconds before retry.
|
Test on go 1.21
Docker build failed with exit code 1, back off 6.435 seconds before retry.
|
Test on go 1.21
Docker build failed with exit code 1, back off 6.792 seconds before retry.
|