Skip to content

chore(deps): bump github.com/gofiber/utils/v2 from 2.0.0-beta.3 to 2.0.0-beta.6 in /arangodb #2063

chore(deps): bump github.com/gofiber/utils/v2 from 2.0.0-beta.3 to 2.0.0-beta.6 in /arangodb

chore(deps): bump github.com/gofiber/utils/v2 from 2.0.0-beta.3 to 2.0.0-beta.6 in /arangodb #2063

Status Failure
Total duration 31s
Artifacts

test-arangodb.yml

on: pull_request
Matrix: Tests
Fit to window
Zoom out
Zoom in

Annotations

5 errors
Tests (1.21.x)
Process completed with exit code 1.
Tests (1.19.x)
The job was canceled because "_1_21_x" failed.
Tests (1.19.x)
The operation was canceled.
Tests (1.20.x)
The job was canceled because "_1_21_x" failed.
Tests (1.20.x)
The operation was canceled.