Skip to content

Commit

Permalink
added planned projects and plotBand to time series chart, updated des…
Browse files Browse the repository at this point in the history
…cription
  • Loading branch information
derekeder committed Jul 12, 2024
1 parent 15f6d45 commit 1b89530
Show file tree
Hide file tree
Showing 5 changed files with 68 additions and 27 deletions.
40 changes: 22 additions & 18 deletions about.html
Original file line number Diff line number Diff line change
Expand Up @@ -28,7 +28,7 @@ <h1>About Illinois Solar Map</h1>
<li><a href="#categories-of-solar-projects">Categories of solar projects</a></li>
<li><a href="#projects-by-category">Projects by category</a></li>
<li><a href="#solar-installations-over-time">Solar installations over time</a></li>
<li><a href="#energized-vs-planned">Energized vs planned projects</a></li>
<li><a href="#planned">Planned projects</a></li>
<li><a href="#data-sources">Data sources</a></li>
<li><a href="#missing-data">Missing data</a></li>
<li><a href="#team-and-collaborators">Team and collaborators</a></li>
Expand All @@ -49,7 +49,7 @@ <h2 id="categories-of-solar-projects" class="mt-4">Categories of solar projects<
<li><strong>Small Distributed Generation (Small DG)</strong>: Small Distributed Generation (DG) for systems 25 kW and below</li>
</ul>

<h2 id="projects-by-category" class="mt-4">Energized projects by category</h3>
<h2 id="projects-by-category" class="mt-4">Energized projects by category</h2>
<div class="row">
<div class="col-md-7">
<div id="table-summary"></div>
Expand All @@ -61,7 +61,23 @@ <h2 id="projects-by-category" class="mt-4">Energized projects by category</h3>
</div>
</div>

<h2 id="planned-projects-by-category" class="mt-4">Planned projects by category</h3>
<h2 id="solar-installations-over-time" class="mt-4">Solar installations over time</h2>

<p>Our data covers utility solar projects starting in December 2009. Data from the Adjustable Block Program and Illinois Solar for All start in 2019.</p>

<p>Planned projects are based on scheduled energization dates, which can be delayed. All planned projects have recieved official approval and, based on our research, have a >95% chance of being built.</p>

<figure class="highcharts-figure">
<div id="timeseries-chart"></div>
<p class="highcharts-description"><strong>Description:</strong> Area chart showing the cumulative megawatts of Utility, Small Distributed Generation, Large Distributed Generation and Community solar energized and planned in Illinois. There is a notable increase in megawatts installed starting in late 2019.</p>

</figure>

<h2 id="planned" class="mt-4">Planned projects</h2>

<p>An additional <strong>{{site.planned_mw}} megawatts</strong> of solar is planned or under construction in Illinois, over double what is currently energized.
</p>

<div class="row">
<div class="col-md-7">
<div id="table-summary-planned"></div>
Expand All @@ -72,23 +88,11 @@ <h2 id="planned-projects-by-category" class="mt-4">Planned projects by category<
</figure>
</div>
</div>

<p><em>** Note: our source data does not show planned community solar projects. They are likely grouped with Large DG.</em></p>

<em>** Note: our source data does not show planned community solar projects. They are likely grouped with Large DG.</em>

<h2 id="solar-installations-over-time" class="mt-4">Solar installations over time</h2>

<p>Our data covers utility solar projects starting in December 2009. Data from the Adjustable Block Program and Illinois Solar for All start in 2019. </p>
<p>You can view where and what kind of projects are planned by clicking the 'Planned' selector on the map:</p>

<figure class="highcharts-figure">
<div id="timeseries-chart"></div>
<p class="highcharts-description"><strong>Description:</strong> Area chart showing the cumulative megawatts of Utility, Small Distributed Generation, Large Distributed Generation and Community solar installed in Illinois. There is a notable increase in megawatts installed starting in late 2019.</p>

</figure>

<h2 id="energized-vs-planned" class="mt-4">Energized vs planned projects</h2>

<p>An additional <strong>{{site.planned_mw}} megawatts</strong> of solar is planned or under construction in Illinois, over double what is currently energized. You can view where and what kind of projects are planned by clicking the 'Planned' selector on the map:
</p>
<p class="text-center">
<a href="/index.html#/?status=planned&geography=counties">
<img src="/images/energized-vs-planned.jpg" class="img-fluid img-thumbnail" alt="Energized vs planned solar projects by County" title="Energized vs planned solar projects by County">
Expand Down
36 changes: 31 additions & 5 deletions data/final/monthly-aggregate.csv
Original file line number Diff line number Diff line change
Expand Up @@ -62,12 +62,38 @@ energization_date,CS,Large_DG,Small_DG,Utility
2023-08-01,218,304,312,927
2023-09-01,218,307,327,933
2023-10-01,218,309,347,937
2023-11-01,224,312,367,1067
2023-12-01,224,316,386,1233
2023-11-01,224,313,367,1067
2023-12-01,224,317,386,1233
2024-01-01,224,321,408,1233
2024-02-01,247,327,429,1233
2024-03-01,247,334,447,1233
2024-04-01,247,341,462,1233
2024-04-01,247,342,462,1233
2024-05-01,261,346,474,1234
2024-06-01,268,347,483,1234
2024-07-01,268,347,483,1234
2024-06-01,268,370,483,1271
2024-07-01,268,377,484,1279
2024-08-01,268,445,485,1346
2024-09-01,268,486,486,1407
2024-10-01,268,508,487,1417
2024-11-01,268,540,489,1417
2024-12-01,268,557,494,1704
2025-01-01,268,582,497,2301
2025-02-01,268,633,505,2301
2025-03-01,268,650,511,2310
2025-04-01,268,676,515,2310
2025-05-01,268,710,525,2325
2025-06-01,268,836,528,2332
2025-07-01,268,905,537,2332
2025-08-01,268,1025,542,2345
2025-09-01,268,1137,552,2397
2025-10-01,268,1233,556,2397
2025-11-01,268,1348,559,2547
2025-12-01,268,1359,560,2547
2026-01-01,268,1429,574,2547
2026-02-01,268,1445,574,2547
2026-04-01,268,1455,574,2547
2026-05-01,268,1522,574,2547
2026-06-01,268,1530,574,2547
2026-07-01,268,1530,574,2617
2027-09-01,268,1530,574,3007
2027-12-01,268,1530,574,4207
2028-06-01,268,1530,574,4707
2 changes: 1 addition & 1 deletion data/final/solar-projects-by-place.geojson

Large diffs are not rendered by default.

3 changes: 2 additions & 1 deletion data/scripts/aggregate_utils.py
Original file line number Diff line number Diff line change
Expand Up @@ -196,7 +196,8 @@ def generate_monthly_kw_time_series():
"""calculate aggregated solar by category over time"""
print("Generating monthly time series...")
# load csv into pandas dataframe
df = pd.read_csv("../final/all-projects-w-districts.csv")
all_files = ["../final/all-projects-w-districts.csv", "../final/all-projects_planned-w-districts.csv"]
df = pd.concat((pd.read_csv(f) for f in all_files), ignore_index=True)

# set energization_date column to datetime
df["energization_date"] = pd.to_datetime(df["energization_date"], format='mixed')
Expand Down
14 changes: 12 additions & 2 deletions js/about.js
Original file line number Diff line number Diff line change
Expand Up @@ -175,14 +175,24 @@ $.when($.get("/data/final/all_projects_summary.csv")).then(
enabled: false
},
title: {
text: 'Cumulative MW of solar installed over time'
text: 'Cumulative MW of solar energized and planned over time'
},
xAxis: {
type: 'datetime',
min: Date.UTC(2018, 0, 1),
labels: {
format: '{value:%b %Y}'
}
},
plotBands: [{
from: Date.UTC(2024, 6, 1),
to: Date.UTC(2028, 5, 0),
color: '#ccc',
label: {
text: 'Planned',
verticalAlign: 'top',
style: {color: '#333', fontWeight: 'bold'}
}
}]
},
yAxis: {
title: {
Expand Down

0 comments on commit 1b89530

Please sign in to comment.