Update sync_docs.yaml #1281
ci.yaml
on: pull_request
Build charm
/
Collect bases for charm | .
16s
Check libraries
27s
Matrix: Build charm / build
Matrix: gh-hosted-integration-test
Annotations
1 error and 2 warnings
2.9/stable - (GH hosted) test_subordinate_charms.py | group 1 | jammy
The process '/usr/bin/sg' failed with exit code 1
|
Unit test charm
Codecov: Failed to properly create commit: The process '/home/runner/work/_actions/codecov/codecov-action/v4/dist/codecov' failed with exit code 1
|
Tests
This workflow ran on a hosted runner that uses the "Base Image for Ubuntu Server 22.04". This image will be deprecated in September 2024. Please setup a new runner to use the "Ubuntu 22.04 by Arm Limited" or "Ubuntu 24.04 by Arm Limited" image. This will help reduce workflow run times as there are pre-installed tools. To view the list of installed software on new images, check out https://github.com/actions/partner-runner-images repository.
|
Artifacts
Produced during runtime
Name | Size | |
---|---|---|
ci-packed-charm-cache-false-.-base-0
Expired
|
22.2 MB |
|
ci-packed-charm-cache-false-.-base-1
Expired
|
22.1 MB |
|
ci-packed-charm-cache-false-.-base-2
Expired
|
21.9 MB |
|