Skip to content

refactor: integration examples #310

refactor: integration examples

refactor: integration examples #310

Triggered via push January 9, 2025 02:28
Status Failure
Total duration 3m 19s
Artifacts

CI.yml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

7 errors and 5 warnings
build (3.8)
Process completed with exit code 1.
build (3.9)
The job was canceled because "_3_8" failed.
build (3.9)
The operation was canceled.
build (3.11)
The job was canceled because "_3_8" failed.
build (3.11)
The operation was canceled.
build (3.10)
The job was canceled because "_3_8" failed.
build (3.10)
The operation was canceled.
build (3.8)
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636
build (3.8)
The process '/usr/bin/git' failed with exit code 128
build (3.9)
The process '/usr/bin/git' failed with exit code 128
build (3.11)
The process '/usr/bin/git' failed with exit code 128
build (3.10)
The process '/usr/bin/git' failed with exit code 128