Skip to content

Clarify installation instructions #210

Clarify installation instructions

Clarify installation instructions #210

Triggered via push December 19, 2024 20:03
Status Failure
Total duration 10m 54s
Artifacts

main.yml

on: push
Matrix: build-and-test
Fit to window
Zoom out
Zoom in

Annotations

7 errors and 2 warnings
build-and-test (linux-gpu-cuda, acc)
Process completed with exit code 2.
build-and-test (linux-gpu-cuda, ompgpu)
The job was canceled because "linux-gpu-cuda_acc" failed.
build-and-test (linux-gpu-cuda, ompgpu)
The operation was canceled.
build-and-test (macos-latest, acc)
The job was canceled because "linux-gpu-cuda_acc" failed.
build-and-test (macos-latest, acc)
The operation was canceled.
build-and-test (macos-latest, ompgpu)
The job was canceled because "linux-gpu-cuda_acc" failed.
build-and-test (macos-latest, ompgpu)
The operation was canceled.
build-and-test (ubuntu-latest, ompgpu)
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636
build-and-test (ubuntu-latest, acc)
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636