Add issue action #213
This run and associated checks have been archived and are scheduled for deletion.
Learn more about checks retention
go.yml
on: push
Check whether tests need to be run based on diff
25s
Verify docs and spelling
24s
Unit test (ubuntu-latest)
6m 5s
Unit test (windows-2022)
6m 9s
Integration test
7m 26s
Golangci-lint (ubuntu-latest)
5m 54s
Golangci-lint (macos-latest)
6m 49s
Build Antrea and antctl binaries
6m 55s
Build Antrea Windows binaries
1m 46s
Check tidy, code generation and manifest
4m 53s
Go benchmark test
4m 23s
Annotations
13 errors
Unit test (ubuntu-latest)
Codecov: Failed to properly upload: The process '/home/runner/work/_actions/codecov/codecov-action/v3/dist/codecov' failed with exit code 255
|
Unit test (windows-2022)
The run was canceled by @XinShuYang.
|
Unit test (windows-2022)
The operation was canceled.
|
Golangci-lint (ubuntu-latest)
The run was canceled by @XinShuYang.
|
Golangci-lint (ubuntu-latest)
The operation was canceled.
|
Integration test
The run was canceled by @XinShuYang.
|
Integration test
The operation was canceled.
|
Build Antrea and antctl binaries
The run was canceled by @XinShuYang.
|
Build Antrea and antctl binaries
The operation was canceled.
|
Golangci-lint (macos-latest)
The run was canceled by @XinShuYang.
|
Golangci-lint (macos-latest)
The operation was canceled.
|
Check tidy, code generation and manifest
The run was canceled by @XinShuYang.
|
Check tidy, code generation and manifest
The operation was canceled.
|