Skip to content

Fix qa

Fix qa #1406

Triggered via push January 20, 2025 23:00
Status Failure
Total duration 6h 0m 23s
Artifacts

main.yml

on: push
Matrix: build
Matrix: continuous-integration
Fit to window
Zoom out
Zoom in

Annotations

17 errors
build (macos-latest, 3.11)
Process completed with exit code 1.
build (ubuntu-latest, 3.11)
The job was canceled because "macos-latest_3_11" failed.
build (ubuntu-latest, 3.11)
The operation was canceled.
build (macos-latest, 3.8)
The job was canceled because "macos-latest_3_11" failed.
build (macos-latest, 3.8)
The operation was canceled.
build (macos-latest, 3.10)
The job was canceled because "macos-latest_3_11" failed.
build (macos-latest, 3.10)
The operation was canceled.
build (macos-latest, 3.9)
The job was canceled because "macos-latest_3_11" failed.
build (macos-latest, 3.9)
The operation was canceled.
build (ubuntu-latest, 3.10)
The job was canceled because "macos-latest_3_11" failed.
build (ubuntu-latest, 3.10)
The operation was canceled.
build (ubuntu-latest, 3.9)
The job was canceled because "macos-latest_3_11" failed.
build (ubuntu-latest, 3.9)
The operation was canceled.
build (ubuntu-latest, 3.8)
The job was canceled because "macos-latest_3_11" failed.
build (ubuntu-latest, 3.8)
The operation was canceled.
continuous-integration (ubuntu-latest, 3.11)
The job running on runner GitHub Actions 17 has exceeded the maximum execution time of 360 minutes.
continuous-integration (ubuntu-latest, 3.11)
The operation was canceled.