You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
As an instrument scientist I would like my IBEX IOC for the pearl pressure controller to tell me what the estimated time is that my pressure cell which reach nominal pressure. Currently there is some logic in the VI which does this:
Follows on from #6040
As an instrument scientist I would like my IBEX IOC for the pearl pressure controller to tell me what the estimated time is that my pressure cell which reach nominal pressure. Currently there is some logic in the VI which does this:
(target_pressure - current_pressure)/(current application rate/60)
the logic for this should be done in the IOC so a block can be placed on the estimated time if required.
The text was updated successfully, but these errors were encountered: