Skip to content

Commit

Permalink
Merge pull request #108 from IBM/v9
Browse files Browse the repository at this point in the history
improved main index page to go to subtopics for Health and Predict an…
  • Loading branch information
carlosibm authored Jun 12, 2024
2 parents 473f463 + ae5adf5 commit c0c2526
Show file tree
Hide file tree
Showing 2 changed files with 9 additions and 8 deletions.
16 changes: 8 additions & 8 deletions MkDocs/apm_9.0/docs/build_demo.md
Original file line number Diff line number Diff line change
Expand Up @@ -469,16 +469,16 @@ Create the third investment strategy `Stay in budget` and run it.


## Meantime Between Failure
<a name="create-group-custom-score"></a>
<a name="mtbf"></a>

To calculated the count of how many assets are achieving or not achieving the meantime to failure requires that you
specify what the threshold is the number of hours an asset needs to be greater than to achieve the meantime of failure
threshold goal. Meantime between failure is calculated as being the amount of time an asset goes before it has an
unscheduled work order being either corrective maintenance or emergency maintenance. The meantime between failure is calculated by summing the amount of time between installation
and the first unscheduled work order and time between each of the next consecutive unscheduled workers divide by the
total number of unscheduled work order events.


specify threshold goal to achieve. For example what is the number of hours an asset needs to go to achieve the meantime
of failure goal. Assets who have a meantime between failure less than the number of hours means they are failing earlier
than requierd and therefore aren't meeting the meantime between failure. Meantime between failures is calculated using
the amount of time an asset goes before it has an unscheduled work order. Where the work order is either a corrective
maintenance or emergency maintenance. The meantime between failure is calculated by summing the total amount of time
between installation and the first and subsequent unscheduled work order divided by the total number of unscheduled
worker order occurences.

### Create Threshold

Expand Down
1 change: 1 addition & 0 deletions MkDocs/toplevel/docs/index.md
Original file line number Diff line number Diff line change
Expand Up @@ -12,6 +12,7 @@ portfolio. The labs are in different states of readiness for use shown below. F
| Lab | Exercise |
|---------------------------------------------------------|--------------------------------------------------------------------------------------------------------------------------------------------------|
| [Health and Predict Setup](apm_9.0/build_demo) | [Setup Health Asset Permissions](apm_9.0/build_demo/#setup-health-asset-permissions) |
| | [Setup Default Health Asset Condition Scores](apm_9.0/build_demo/#default_score) |
| | [Create an Asset](apm_9.0/build_demo/#create_asset) |
| | [Health Score Groups](apm_9.0/build_demo/#setup_health_score_group) |
| | [Create Score Type](apm_9.0/build_demo/#create-score-type) |
Expand Down

0 comments on commit c0c2526

Please sign in to comment.