chore: try to fix the security scorecard action #8294
Triggered via pull request
November 26, 2024 17:21
Status
Failure
Total duration
20m 23s
Artifacts
–
integration-linux.yml
on: pull_request
Matrix: PR integration tests (linux)
Annotations
5 errors
PR integration tests (linux) (5.0.3, 0.4.0, 1.21.0, 1.0.0-beta.24, 1.30.1, 410.0.0, 1.8.0, 3)
Process completed with exit code 2.
|
PR integration tests (linux) (5.0.3, 0.4.0, 1.21.0, 1.0.0-beta.24, 1.30.1, 410.0.0, 1.8.0, 2)
The job was canceled because "_5_0_3_0_4_0_1_21_0_1_0_4" failed.
|
PR integration tests (linux) (5.0.3, 0.4.0, 1.21.0, 1.0.0-beta.24, 1.30.1, 410.0.0, 1.8.0, 2)
The operation was canceled.
|
PR integration tests (linux) (5.0.3, 0.4.0, 1.21.0, 1.0.0-beta.24, 1.30.1, 410.0.0, 1.8.0, 0)
The job was canceled because "_5_0_3_0_4_0_1_21_0_1_0_4" failed.
|
PR integration tests (linux) (5.0.3, 0.4.0, 1.21.0, 1.0.0-beta.24, 1.30.1, 410.0.0, 1.8.0, 0)
The operation was canceled.
|