Skip to content

Commit

Permalink
Update README.md
Browse files Browse the repository at this point in the history
  • Loading branch information
Fragtality authored Aug 29, 2024
1 parent 5eec4b5 commit 8954d48
Showing 1 changed file with 1 addition and 1 deletion.
2 changes: 1 addition & 1 deletion README.md
Original file line number Diff line number Diff line change
Expand Up @@ -163,7 +163,7 @@ Besides that general Best Practice, there is nothing Special to consider - Plan
- Else **Boarding** will start automatically **after Refuel and Catering** (if configured) are **finished**.
- The PCA will be removed anytime the **APU is running** and the APU **Bleed is On**.
- The Stairs will be removed **as soon as the Boarding** Service is reported as **finished** (if configured).
- **Both Loadsheets** will be transmitted 90 - 150 Seconds **after the Boarding and Refueling** Service is reported as **finished**. On **Reception** the **Doors are closed** (if still open), you will hear the Cabin **"Ding" Sound** and see the **"Aircraft Loaded"** Notification in the EFB.
- The **Final Loadsheet** will be transmitted 90 - 150 Seconds **after Boarding and Refueling** Service is reported as **finished**. On **Reception** the **Doors are closed** (if still open), you will hear the Cabin **"Ding" Sound** and see the **"Aircraft Loaded"** Notification in the EFB.
- It is recommended to **wait with Pushback** until you received the **Final LS**. (Fenix2GSX needs to trigger an "Instant Load" and I don't know if that is a good Idea when the Airplane started moving)
- The **Removal** of **Ground-Equipment** is triggered by **two Situations**:
- Parking **Brake Set** AND External **Power Off** AND **Beacon On**.
Expand Down

0 comments on commit 8954d48

Please sign in to comment.