Skip to content

Merge pull request #1393 from OpenInterpreter/development #58

Merge pull request #1393 from OpenInterpreter/development

Merge pull request #1393 from OpenInterpreter/development #58

Triggered via push August 13, 2024 05:07
Status Failure
Total duration 6h 0m 24s
Artifacts
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

4 errors
build (3.10)
The job running on runner GitHub Actions 8 has exceeded the maximum execution time of 360 minutes.
build (3.10)
The operation was canceled.
build (3.12)
The job running on runner GitHub Actions 13 has exceeded the maximum execution time of 360 minutes.
build (3.12)
The operation was canceled.