Skip to content

feat: Sync from noir #31248

feat: Sync from noir

feat: Sync from noir #31248

Re-run triggered December 16, 2024 14:49
Status Cancelled
Total duration 17m 10s
Artifacts 2

ci.yml

on: pull_request
configure
12s
configure
setup  /  start-builder
20s
setup / start-builder
build-images
2s
build-images
bench-test-gate
0s
bench-test-gate
e2e-test-gate
0s
e2e-test-gate
yarn-project-test
13m 15s
yarn-project-test
Matrix: e2e
Matrix: kind-network-full-test
bb-bench
0s
bb-bench
protocol-circuits-gates-report
13m 14s
protocol-circuits-gates-report
public-functions-size-report
7m 7s
public-functions-size-report
bb-acir-tests-bb
5m 18s
bb-acir-tests-bb
bb-acir-tests-bb-ultra-plonk
13m 14s
bb-acir-tests-bb-ultra-plonk
bb-acir-tests-bb-ultra-honk
9m 47s
bb-acir-tests-bb-ultra-honk
bb-acir-tests-bb-client-ivc
3m 23s
bb-acir-tests-bb-client-ivc
bb-acir-tests-sol
4m 39s
bb-acir-tests-sol
bb-acir-tests-sol-honk
7m 34s
bb-acir-tests-sol-honk
bb-acir-tests-bb-js
13m 42s
bb-acir-tests-bb-js
acir-bench
0s
acir-bench
Matrix: bench-e2e
rough-rhino-installer
0s
rough-rhino-installer
network-test-gate
0s
network-test-gate
bench-summary
0s
bench-summary
Matrix: boxes-test
network-transfer-test
0s
network-transfer-test
Matrix: network-full-test
merge-check
0s
merge-check
rerun-check
0s
rerun-check
notify
0s
notify
Fit to window
Zoom out
Zoom in

Annotations

48 errors and 2 warnings
noir-examples
The runner has received a shutdown signal. This can happen when the runner service is stopped, or a manually started runner is canceled.
e2e (integration_l1_publisher)
Process completed with exit code 255.
e2e (e2e_cheat_codes)
Process completed with exit code 255.
e2e (e2e_nested_contract)
Process completed with exit code 255.
e2e (e2e_epochs)
Process completed with exit code 255.
e2e (guides_writing_an_account_contract)
Process completed with exit code 255.
e2e (e2e_fees_failures)
Process completed with exit code 255.
e2e (e2e_avm_simulator)
Error: SSH command failed with code 255
e2e (e2e_avm_simulator)
SSH command failed with code 255
e2e (e2e_max_block_number)
Error: SSH command failed with code 255
e2e (e2e_max_block_number)
SSH command failed with code 255
e2e (e2e_prover_coordination)
Error: SSH command failed with code 255
e2e (e2e_prover_coordination)
SSH command failed with code 255
e2e (e2e_crowdfunding_and_claim)
Error: SSH command failed with code 255
e2e (e2e_crowdfunding_and_claim)
SSH command failed with code 255
e2e (e2e_fees_gas_estimation)
Error: SSH command failed with code 255
e2e (e2e_fees_gas_estimation)
SSH command failed with code 255
e2e (guides_dapp_testing)
Error: SSH command failed with code 255
e2e (guides_dapp_testing)
SSH command failed with code 255
e2e (guides_sample_dapp)
Error: SSH command failed with code 255
e2e (guides_sample_dapp)
SSH command failed with code 255
e2e (e2e_amm)
Error: SSH command failed with code 255
e2e (e2e_amm)
SSH command failed with code 255
e2e (e2e_static_calls)
Error: SSH command failed with code 255
e2e (e2e_static_calls)
SSH command failed with code 255
e2e (e2e_prover_fake_proofs)
Error: SSH command failed with code 255
e2e (e2e_prover_fake_proofs)
SSH command failed with code 255
e2e (e2e_authwit)
Error: SSH command failed with code 255
e2e (e2e_cross_chain_messaging)
Error: SSH command failed with code 255
e2e (e2e_authwit)
SSH command failed with code 255
e2e (e2e_cross_chain_messaging)
SSH command failed with code 255
e2e (e2e_block_building)
Error: SSH command failed with code 255
e2e (e2e_block_building)
SSH command failed with code 255
e2e (guides_up_quick_start)
Error: SSH command failed with code 255
e2e (guides_up_quick_start)
SSH command failed with code 255
e2e (e2e_deploy_contract)
Error: SSH command failed with code 255
e2e (e2e_deploy_contract)
SSH command failed with code 255
e2e (e2e_lending_contract)
Error: SSH command failed with code 255
e2e (e2e_lending_contract)
SSH command failed with code 255
e2e (e2e_2_pxes)
Process completed with exit code 255.
e2e (e2e_fees_private_payments)
Error: SSH command failed with code 255
e2e (e2e_fees_private_payments)
SSH command failed with code 255
e2e (guides_sample_dapp_ci)
Process completed with exit code 255.
e2e (e2e_ordering)
Process completed with exit code 255.
Error
connection error: desc = "error reading server preface: command [docker exec -i earthly-buildkitd buildctl dial-stdio] has exited with exit status 1, please make sure the URL is valid, and Docker 18.09 or later is installed on the remote host: stderr=error: dial unix /run/buildkit/buildkitd.sock: connect: no such file or directory\n"
prover-client-test
Canceling since a higher priority waiting request for 'ci-10760/merge' exists
prover-client-test
The operation was canceled.
merge-check
Process completed with exit code 1.
setup / start-builder
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636
Deprecation notice: v1, v2, and v3 of the artifact actions
The following artifacts were uploaded using a version of actions/upload-artifact that is scheduled for deprecation: "sync-noir.protocol_circuits_report.json", "sync-noir.public_functions_report.json". Please update your workflow to use v4 of the artifact actions. Learn more: https://github.blog/changelog/2024-04-16-deprecation-notice-v3-of-the-artifact-actions/

Artifacts

Produced during runtime
Name Size
sync-noir.protocol_circuits_report.json
56.5 MB
sync-noir.public_functions_report.json
74.1 KB