[💡 FEATURE REQUEST]: Parallelize the pipeline create and destroy process #1672
Labels
C-feature-request
Category: feature requested, but need to be discussed
Milestone
Plugin
JOBS
I have an idea!
I ran into a problem with Jobs plugin. It appears when i use a large number of pipelines, for example we have 80.
The RR takes a long time to destroy and serve, because each pipeline (with driver) stops and starts sequentially.
As a result, the restart takes a few minutes, and in case of failure (for examle, network problems with AMQP driver), a few more minutes.
Tasks
The text was updated successfully, but these errors were encountered: