You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
The shopfloor information results contains the forecasting information exchanged between the Modular Production and a second party (customer, logistical etc.).
The forecasting information gives an overview about the current processing state of a product and the estimated production date.
This information will be exchanged between the partners either on request, cyclic with a fixed cycle or on notification, if a forecast is changing.
In Case of cyclic and notification Exchange, it is necessary to unsubscribe from the notification, which is dealt in this
Relevant Standards
Example Data
SMC
Property
mand./opt.
Semantic ID
Remark
header
RequestID
mandatory
senderBpn CXPartnerID
mandatory
identification of the sender
recipientBpn
mandatory
identification of the recipient
context
mandatory
Information about the context the message should be considered in, e.g. "MP-Request"
messageId
mandatory
unique ID for message will be used as requestID for the following communication
sentDateTime
mandatory
time of request
version
mandatory
of meta model used for compatability
relatedMessageId
mandatory
UUID of request messageId for identification of related messages
body
MS1 Criteria
The proposed aspect model does not exist already
The proposed aspect model does not extend an existing aspect but introduces completely new functionality
The proposal references a Catena-X use case
Relevant standards are mentioned/linked
A first draft of the data structure is provided in an example
The text was updated successfully, but these errors were encountered:
Model Description
The shopfloor information results contains the forecasting information exchanged between the Modular Production and a second party (customer, logistical etc.).
The forecasting information gives an overview about the current processing state of a product and the estimated production date.
This information will be exchanged between the partners either on request, cyclic with a fixed cycle or on notification, if a forecast is changing.
In Case of cyclic and notification Exchange, it is necessary to unsubscribe from the notification, which is dealt in this
Relevant Standards
Example Data
MS1 Criteria
The text was updated successfully, but these errors were encountered: