Replies: 2 comments 8 replies
-
Did you tried using the |
Beta Was this translation helpful? Give feedback.
-
Your prod price seems pretty high for me. So that would explain why is trying to maximize profit by selling PV to the grid. |
Beta Was this translation helpful? Give feedback.
-
I've configured two deferrable loads together with solcast and mlforecaster to calculate the day-ahead optimizations. One deferrable load is non semi-continuous variable with 4kw and 6 hours to operate. The second one is semi-continuous with 4kw and 4 hours to operate.
Running emhass I recognized that the on-phased especially of the non semi-continuous deferrable load is splitted into multiple time segments even if there would be enough energy to continuously operate the deferrable in a single time window and attach the second one after it.
As far as I know it is suggested to power-on and power-off a heatpump as less as possible as it might have an impact on the lifetime of the heatpump.
The second thing I recognized that parts of the splitted on time-windows are pushed to the end of the solar power production phase taking the risk that the during the end of the day the real values to diverge more often from the forecasted values.
The following picture shows both behaviours:
Is there a possiblity to control the number of times a deferrable load and or should be turned on and off again? Do you have other suggestions to optimize the forecasted values?
Values integrated in HA:
Beta Was this translation helpful? Give feedback.
All reactions