You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
As someone getting the T-Jump up and running I'd like to test that the system works with IBEX
Acceptance Criteria
An up to date version of IBEX/the T-Jump IOC is available on SOFTMAT
The system is tested with the team in the soft matter lab
Notes
This is planned for Mid October, but is waiting on the availability of the hardware (still being worked on) and it being put in the soft matter lab
It was implied that we could not test at this time, and so there is a reputational advantage in actually testing this, as we are in a state to do so, and if there are any errors there will be a chance to fix them before the system is in place on a beamline
The system will be tested/used on LOQ during cycle 2022/04 (November - December 2022)
At least the T-JUMP IOC is needed, the system level would also be useful, an up to date IBEX might not be a bad idea
The text was updated successfully, but these errors were encountered:
As someone getting the T-Jump up and running I'd like to test that the system works with IBEX
Acceptance Criteria
Notes
The text was updated successfully, but these errors were encountered: