MacAdam 1820 road.
Price ans maintenance.
1820-MacAdam-road. Labor-cost basis 1750 1 HCrc
Inflation 3% 1,03 >> 1820= 0,08 HCr
Costs for 10 tiles(125) Width 5m Stone-Tech Intro 1750
Basis: max five tile radius from Road-building-storage Inflation stoneprice %/year 1,5% >>>>>>>>>} 1,015
Sand and stone available in Road-building-storage # Stonework-Efficiencyincr, %/year 1% >>>>} 0,99
Next 10 tiles need new Road-building-storage Stoneprice 1750 0,1 HCr/ton
Sandprice=Stoneprice
Activities: a. Digging 350mm and leveling (stony, roots)
b. Filling with sand 150mm +compacting
c. First layer 200mm of 75mm stone
d. Second layer 50mm of 20mm stone
e. Compacting (cast-iron roller + horses) Wages: Materials:
Cost a : Calc 2,5 h/m2 >> 12,5h/5m width >> 12500 h/km a 0,08 = 1000 HCr
Transport: s.g. earth 2t/m3. 12 WB/ton 8 h/day
Average way(2-way) 600m. Speed 4km/h Time/run= 0,15
Calc ton/km: 0,35*5*100*2 = 3500 ton
Calc transport:3500*12*0,15 6300 hours a 0,08 504 HCr
Cost b : On the way back filling sand transport.
Leveling sand : 0,15*5*1000*2 = 1500 tons 425 HCr
Leveling +compact. (0,1 h/m2): 500 hours a 0,08 40 HCr
Cost c: First layer Consists of 5 layers(stone70)
.Per layer/m2: 100/7*100/7 stones= 204,0816327 ~205 stones/m2
5 layers > 1025 stones Weight stone 0,4 ton/m2
a 5 sec/stone >> 5125 sec/m2 1,423611111 ~1,5 h/m2
1 km 1rst layer >> 7500 hours a 0,08 600 HCr
1 km 1rst layer-stone 1000*5*0,4= 2000 ton stone70 567 HCr
Cost c: Toplayer 5/20*2000ton= 500 ton stone20 142 HCr
Leveling +compact. (0,1 h/m2): 500 hours a 0,08 40 HCr
Transport : 5/20 first layer 150 HCr
Cost d: Man+2horses + cast iron roller 5km/h 50 runs 10 hours a 0,20 2 HCr
Totals 2336 1134
Wages+Materials 3470
Coverage tools 5% 174
New Total 3644
Overhead 20% 729
Grand total 4372 Rounded 4400 HCr/km (550/tile)
Monthly Coast Maintenance per 20km 2 man, horse and bulkwagon
24 hour-economy > 2*720=1440 hours/month = 115,2 HCr/20km 5,76 HCr/km/month
horse +wagon (old stuff) + 9 ton small stone 10 0,5
Depreciation road 50 years = 7,3
Total 13,6 HCr/km/month of 720 hours.
At BmP25 : 51,2/720 = 1,0 HCr/km/month
At BmP22 : 6,4/720 = 0,12 HCr/km/month